PROJECTS
OUR PROJECTS
Completed Major Domestic Projects
S.No | Description of Work | Client | Location of Work |
---|---|---|---|
1 | Carrying out Stage-1 preliminary route selection for new High Speed Rail Corridors (Delhi – Noida – Agra – Kanpur – Lucknow - Varanasi) (865 Km) for NHSRCL. | National High Speed Rail Corporation Limited | Delhi-Varanasi |
2 | Carrying out reconnaissance survey, setting up of traverse grid network through DGPS and terrestrial survey method along the identified corridor between Katra(km30) to Banihal(km150) in Katra-Qazigund section of USBRL Project in the state of J&K. | IRCON International Ltd. New Delhi | Jammu & Kashmir |
3 | Development of New Alignment including Refinements, Geological & Geophysical mapping, Final Location Survey and detailed Abstract Cost Estimating of 125 km long Broad-Gauge New Rail Link Between Rishikesh and Karanprayag via Devprayag in the state of Uttarakhand, India. | RVNL | Rishikesh |
4 | Detail Engineering construction survey for detour "Hafizpur to Daurala & Khatauli to RohanaKalan" and/or at any other location as directed by the Engineer-in-charge, staking out alignment, preparation of land plan, Geotechnical investigation, preparation of GAD for bridges and yard plans, providing facilitation services for Land Acquisition and other preliminary work on Eastern Dedicated Freight Corridor in the jurisdiction of CPM/Meerut. | DFCCIL | Meerut |
5 | Preparation of L-section, major and minor bridge GAD drawings, level crossing drawings with all details, electrical and telecommunication crossing drawings and other details after details survey of existing track and all features in connection with doubling work in between Varanasi (Excluding) to Allahabad (120.20 km). | RVNL | Varanasi to Allahabad |
6 | Final Location Survey including preparation of detailed plans and sections and detailed estimate, marking center line, Geotechnical investigation in connection with third line of Pendra Road- Anuppur section (50.10 km) of Bilaspur Division of South East Central Railway | RITES Ltd. Gurgaon | Anuppur-Pendra |
7 | Carrying out traverse grid network through DGPS and terrestrial survey method along the identified corridor Between Sivok in West Bengal to Rangpo in Sikkim for Sivok Rangpo new BG rail line project. | IRCON | West Bengal & Sikkim |
8 | Conducting final location survey including reparation of detailed plans and sections and detailed estimation, marking center Line, geotechnical investigation and detailed design engineering in connection with doubling along with electrification (OHE and General electrification work) and S&T WORKS OF Bhimsen Jhansi (206.0 kms.) route of Jhansi Division of North central Railway in the State of Uttar Pradesh, India. | RVNL | Bhimsen Jhansi |
9 | Consultancy Services for Development and Preparation of GAD after conducting survey with Total station and Drone, designing of yard layout and other associated works at the proposed site for setting up of Coach Periodic Overhauling And Rehabilitation workshop at Sonipat. | RVNL | Sonipat |
10 | Topographic Survey using DGPS, Total Station, Auto Level and preparation of drawings using mapping software for preparation of DPR for MRTS in Nashik. | RITES Ltd. Gurgaon | Nashik, Maharashtra |
11 | Topographical survey of BCPL plant, CISF Barracks & Township Area. (555.02 Hectare). | RITES Ltd. Gurgaon (GT Division) | Assam |
12 | Line Survey & Fixing of Pickets along with Seismic team of RITES for Tunnel – 69 to Tunnel – 72 on the Laole – Qazigund Section of USBRL project. | RITES Ltd. Gurgaon (GT Division) | Jammu & Kashmir |
13 | Carrying out reconnaissance survey, preliminary design of alignment, traversing, Leveling, preparation of plans and Lsections and establishment of control pillars etc. in the problematic section of Railway alignment in General area of km 137 to km 144 from T – 67 to T – 74 of Dharam – Qazigund section of USBRL. | RITES Ltd. Gurgaon (GT Division) | Jammu & Kashmir |
14 | Design of Alignment based on the Topographical Survey for DFCC west packages from Khori (Km 10) to Ajmer (Km 294) section – 284 Km of DFCC Western Corridor. | Mitsui Ircon Leighton Consortium Gurgaon | Rajasthan |
15 | Carrying out Final Location Survey using DGPS & Total Station traverse and leveling work along the proposed alignment of the Railway connectivity from Basundhara coal mine to Jharsuguda Thermal Power Plant(46.5Km) . | L&T Faridabad | Jharsuguda, Orrisa |
16 | Topographic Survey for 200m wide corridor including picking up all features, preparation of 3d plan, L-section, cross sections required for Geological Mapping in the section of Railway alignment for km 64 to 91.2000, 7 adits of tunnels & escape tunnel no-2 of T-6 of Katra-Dharam section of USBRL Project. | RITES Ltd. Gurgaon | Katra-Dharam |
17 | Establishment of Ground control points using DGPS along the proposed Alignment from Asaoti to Chennai via Agra-Jhansi- Ballarshah- Dronakal on North-South (Delhi-Chennai Route) Dedicated Freight Corrido | RITES Ltd. Gurgaon | Asaoti - Chennai |
18 | Topographical & final Location survey for the proposed railway siding for transportation of coal/lime to Bongaigaon Thermal Power Project at Salakati Dist. Kokrajhar (Assam) | RITES Ltd. Gurgaon | Assam |
19 | Conducting Survey with total station, designing of yard layout and preparation of GAD for the construction of proposed 259 High Horse Power Diesel Locomotive Shed and construction of 100 Electric loco Shed both near Barauni Station of East Central Railway in the state of Bihar. | Rail Vikas Nigam Limited, Patna | Bihar |
20 | Preparation and submission of L-section, Details Estimate & BOQ in connection with doubling of Rae Bareli (60.1 Km) Section on Lucknow -Varanasi route of Lucknow Division of Northern railway in the state of Uttar Pradesh. | Rail Vikas Nigam Limited | Lucknow |
21 | Topographical Survey & Final Location Survey from KM 149 to KM 310 (Ringas to Saradhana) which includes the work as defined in the BOQ (Annexure –A) for western Dedicated Freight Corridor Project Pkg1&2 (Rewari to Iqbalgarh), passing through Haryana, Rajasthan& Gujarat as per Governing Specifications. | Larson & Toubro | Rajasthan, Gujarat & Haryana |
22 | Alignment Design from KM 202 to KM 416 (Khnedel to Bhesana, 227 KM including sidings) which includes the wok as defied the BOQ (Annexure ‘A’) for western dedicated Corridor project pkg 1&2) (Rewari to Iqbalgarh) passing through Haryana, Rajasthan & Gujarat as per governing Specifications. | Larson & Toubro | Rajasthan, Gujarat & Haryana |
23 | ARC Track Maintenance work for JPL Railway siding. | CLP India,Haryana | Jhajjar, Haryana |
24 | RTRS Track & Maintenance at Terminal Ballistic Research Laboratory, Ramgarh, Sector-30, Chandigarh. | RITES Ltd., Gurgaon (MoD,GOI) | Chandigarh |
25 | Services for carrying survey and allied works for DPR of Construction of Highway Tunnel including Approaches across Shinkun La, Tanglang La & Lachalung La in the Union Territory of Ladakh. | RITES Ltd. | Shinkun La Himachal Pradesh & Ladakh. |
26 | Site Survey works of the Single BG Line Rail connectivity to Chardham & Chardham Yatra (Gangotri & Yamunotri) - 153 KMS Long (Package-I) & Single BG Line Rail connectivity to Chardham & Chardhamyatra (Badrinath & Kedarnath) - 174 KMS Long (Package-2) in the state of Uttarakhand, India. | YUKSEL PROJE | Chardham |
27 | Preparation and Submission of Land acquisition proposals and obtaining of Forest Clearance Permission works of the Final Location Survey of Approx. 327 Kms long single BG Line Rail connectivity to Chardham and Chardham Yatra (Yamunotri, Gangotri, Badrinath and Kedarnath) In the state of Uttarakhand, India. | YUKSEL PROJE | Chardham |
28 | Conducting Final Location Survey including preparation of detailed plans and sections and detailed estimate marking center line. Geotechnical investigation and detailed design engineering in connection with doubling along with electrification and S&T works of Section-I:- 106.25 kms (Mathura km 1397.06 to Dholpur km 1290.81) Third line in N.E. Railway. | RVNL | Mathura-Dholpur |
29 | Consultancy Service for carrying out survey and allied works for Six tunnels between Jagdalpur-Koraput &Koraput-Singapur Section of WAT Division, East Coast Railway. | RITES Ltd. | Jagdalpur-Koraput |
30 | Consultancy Service for carrying out topographic survey and allied works for alignment and tunnel in Madanapalle-Madaghatta section in connection with Kadapa-Bangalore new BG line of South-Central Railway. | RITES Ltd. | Madanapalle-Madaghatta |
31 | Geotechnical investigation of Ganga Bridge Approaches in construction of 36x32.6M span on viaduct at both sides of Jhunsi and Draganj Station NER, Allahabad in the state of Uttar Pradesh, India. | RVNL | Allahabad |
Electrical Projects
S.No | Description of Work | Client | Location of Work |
---|---|---|---|
1 | Carrying out foot by foot survey for entire section of Budni (Including) - Indore (Mangaliyagaon) (Including) new line under Bhopal Division of West Central Railway 205.5 RKM. | RVNL | Budni-Indore |
2 | Preparation of design and drawings for overhead Equipment & Verification of Pegging Plans Group- 149 . | Larsen &Toubro Limited, Brahmaputra, Muzaffarpur | Bihar |
3 | Detailed Survey of HT < track crossing, Soil investigation & Preparation of Pegging Plans with provision future patch doubling of Bhigvan- Gulbarga Section of Central Railway . | Rail Vikas Nigam Limited, Pune | Maharashtra |
4 | Work of survey of Tracks and preparation and supply of OHE Pegging plan for the section of Hajipur (Excl) – Barauni Jn (Excl) via Muzaffarpur section of E.C. Rly | Railway Electrification, Lucknow | Bihar |
5 | Work of Survey of tracks and preparation and supply of OHE Pegging plan for ChhapraKatchehari (Excl)- BabachhwaraJn (Excl) including Patna – HJP via Ganga Bridge Section of EC Rly. | Railway Electrification, Lucknow | Bihar |
6 | Making of Wiring Diagram and Sectioning Diagram on Tracing Paper for Gr142 &141. | Railway Electrification, Gorakhpur | U.P. |
7 | Making of Survey and pegging plan, wiring diagram and sectioning diagram on tracing paper for Siwan-Thawe Section. | Railway Electrification, Gorakhpur | U.P. |
8 | Survey of track and preparation and supply of OHE Pegging Plan for BJU- KIR Sections | Railway Electrification, Hajipur | Bihar |
9 | Foot- By-Foot Survey &Preparation of Pegging Plan for Katihar (Including) Salmari and Katihar to Dilli Dewanganj Halt Section under KIR Division of North Frontier Railway. | Railway Electrification, NewJalpaigur | West Bengal |
10 | Foot- By-Foot Survey &Preparation of Pegging Plan for Gondia- Ballarshah of S.E.C. Railway. | RE, Secunderabad | Maharashtra |
11 | Detailed Survey, Preparation of Pegging Plans, Location plans, Sectioning Diagram of Section Daund - Manmad incl. Puntamba - Shirdi single Line. | Rail Vikas Nigam Limited, Pune | Maharashtra |
12 | Preparation of Sectioning Cum Wiring Diagram, Power Supply 8Diagram and Pegging Plan for E9lectrification of Railway Track from Ramnagar (Excluding), Jalpaiguri District (west Bengal) to New Bongaingaon (Excluding), Bongaingaon District, (Assam) under Alipurduar Division of Northeast Frontier Railway (390 TKM) (GR-151) & EHT Power Line Crossing Drawings. | Railway Electrification, New Jalpaiguri | W. Bengal & Assam |
13 | Preparation of pegging plan for proposed DFC Line Dahnkuni to Dhanbad | RITES Ltd. Gurgaon | Bihar & Jharkhand |
14 | Preparation of 25 kV, AC OHE Pegging plan for Mindi yard At Vizag port (VPT) 25 TKM. | RITES Ltd. Gurgaon | Andhra Pradesh |
15 | Preparation of design drawing for 25 KV ,1 phase OHE in connection with the work of consultancy services for detailed engineering of MUTP-PH-II works –provision of 5th &6th line between CSTM –Kurla Section on Central Railway . | RITES Ltd. Gurgaon | Maharashtra |
16 | OHE Design and drawing works in MMR-RRI-DD Railway project | LARSEN &TOUBRO LIMITED (ECC Division) Kopargaon, Ahmednagar-423601 | Maharashtra |
17 | Preparation of Station Working Rule Diagram from CI-BJU via SPP Of E C Railway | Railway Electrification, Hajipur | Hajipur |
18 | Preliminary survey ,preparation of route alignment, detail survey ,preparation of route profile ,tower spotting &pillaring for construction of 132 KV ,2 phase , single circuit transmission line on double circuit tower for railway traction substation at Khagaria , Naugachia and Katihar including soil investigation in Barauni –Guwahati section of east central railway in the jurisdiction of Bihar State ,(from Khagaria GSS of BSEB to Khagaria TSS=3 Km Naugachia GSS of BSEB to Naugachia TSS=6 Km. Existing Purnea – Katihar transmission line of BSEB (Location No-9) to Katihar TSS by means of T-off Connection =4 Km. Total=13) | Railway Electrification, Hajipur | Hajipur |
19 | Supply, Preparation of drawing and printing pertaining to LT and HT modification work and surveying collecting and measuring of clearances and other information regarding 132 KV HT crosses in Barauni –Katihar section of group 149. | Railway Electrification, Hajipur | Hajipur |
20 | Preparation of Yard Drawing & incorporating individual yards plans of various stations in one sheet through Auto-Cad software and printing of sheet on flex and to paste on card board to install in the cubicles of various section of operating control room in Sonepur DRM office. | Railway Electrification, Hajipur | Hajipur |
21 | Preparation, supply and erection of OHE sectioning diagram board for TPC Sonepur as per enclosed schedule of work & explanatory notes. | Railway Electrification, Hajipur | Hajipur |
Signal & Telecommunication Projects
S.No | Description of Work | Client | Location of Work |
---|---|---|---|
1 | Preparation of signaling plan and SWRD of stations in Krishna-Nagar (excl) Lalgola section . | Railway Electrification Kolkata | Kolkata |
2 | Preparation of Signal Interlocking Plan (SIP), Circuit diagram & other related drawings based on Revised Engineering Plan and Scrutiny & revision as per requirement of draft Detailed Project Reports (DPR) and PMC for monitoring and Supervision of Signaling& Telecommunication work of Railway siding at BolaniOre Mines. | RITES Ltd., Gurgaon (EE Division) | Orissa |
3 | Preparation of SIP Mahesh hunt- Thana Bihpur, Kursell-Semapur Doubling work, Jaynagar-Darbhanca Gauge conversion, Sakri –Birul&Muzaffarpur -Sitamarhi New lines of E.C.Rly | Office of the CSTE (con) Mahendrughat, Patna, E C Rly | Patna |
4 | Preparation of SIP | Office of the CSTE (con) Mahendrughat, Patna, E C Rly | Patna |
5 | Preparation of Signaling Plan of stations in CPR-BJU section SEE division of EC railway. | Office of the Dy.CSTE /RE/DANAPUR | Patna |
6 | Preparation of SIP | Office of the CSTE (con) Mahendrughat, Patna, E C Rly | Patna |
7 | Preparation of SIP | Office of the CSTE (con) Mahendrughat, Patna, E C Rly | Patna |
8 | Preparation of SWRD and Ferro printing of tracing print | Office of the Dy CEE, HJP Railway Electrification | Patna |
9 | Annual Maintenance Contract (AMC) for Signaling & Telecommunication Equipment for JPL Railway Siding. | CLP India, Haryana | Jhajjar, Haryana |
Completed International Projects
S.No | Description of Work | Client | Location of Work |
---|---|---|---|
1 | Carrying out the DGPS & Total Station traverse and Leveling work along the proposed alignment of the Railway connectivity from Km 234+000 (Bhairab Bazar Station) to Km 230+000 (Ashuganj Block Hut) Bhairab bridge & Km 203+000 (Akhaura Block Hut) to Km 202+000 (Akhaura Bypass Cabin) in Bangladesh. | IRCON International Ltd. New Delhi | Bangladesh |
2 | Topographical Survey for Design of alignment for Construction of 3rd, 4th Dual Gauge Railway Track between Dhaka – Tongi – Section and Doubling of Dual Gauge Track Tongi – Joydebpur section in Bangladesh. | IRCON International Ltd. New Delhi | Bangladesh |
3 | Staking of Alignment and Preparation of Land Acquisition Plan (LAP) for construction of new rail line between Akhaura and India –Bangladesh Border (Near Agartala) in Bangladesh. | IRCON International Ltd. New Delhi | Bangladesh |
Private Siding Projects
S.No | Description of Work | Client | Location of Work |
---|---|---|---|
1 | Preparation of Feasibility Study Report (FSR), DPR including Detailed plans and sections along with electrification (OHE and General Electrification works) and S&T works for the development of Private Freight Terminal near Bhambhewa Railway Station on JHI-SNP section of Delhi Division Northern Railway. | Jind Agri Services Private Limited | Bhambhewa |
2 | Preparation of Detailed Project Report (DPR), including Detailed Plans and sections along with electrification (OHE and General Electrification Works) and S&T works for the development of Development of Private Freight Terminal cum Inland container depot at samba station (SMBX) Pathankot-Jammu Section, Firozpur Division, and Northern Railway. | Associated Container Terminals Limited | Samba |
3 | Consultancy services for connectivity of NPL Railway Siding with DFC Network. | NPL | Saraibanjara |
4 | Final Location Survey and Geotechnical Investigation for providing Consultancy Services for the preparation of Detailed Project Report of Railway Siding of Khurja thermal Power Project, in district Bulandshahr, UP. | RITES Ltd., Gurgaon | Bulandshahr |
5 | Geo referencing, topographical survey & staking of center line of the proposed MGR & POL siding. | RITES Ltd. Gurgaon | Sundergarh |
6 | Carrying out the DGPS & Total Station traverse and Leveling work along the proposed alignment of the Railway connectivity from Saraibanjara to Rajpura Thermal Power Plant (18 Km). | L&T Faridabad | Saraibanjara |
7 | Topographical Survey, Design of Horizontal, Vertical Alignment & Calculation of Discharge of Minor Nala for Khargone STPP of M/s. NTPC Ltd., Khargone (M.P). | RITES Ltd., Gurgaon | Khargone |
8 | Topographical Survey, Design of Horizontal, Vertical Alignment & Calculation of Discharge of Minor Nala for Railway Siding of MEJA TPP, District-Allahabad, Uttar Pradesh. | RITES Ltd., Gurgaon | Allahabad |
9 | Marking of land boundary with the help of Khasra map, staking of Alignment including fixing of Pre-cast RCC Pillars for Railway siding of Meja TPP, Distt: Allahabad. | RITES Ltd., Gurgaon | Allahabad |
10 | Detailed topographical field survey for Development of MMLP on western DFC route at New Phulera Jn. In Jaipur Distt. , Rajasthan. | RITES Ltd., Gurgaon | Phulera |
11 | Detailed topographical field survey for Development of MMLP on western DFC route at Prithla in Faridabad Distt., Haryana. | RITES Ltd., Gurgaon | Prithla |
12 | Detailed topographical field survey for Development of MMLP on western DFC route at Salawas Railway Station on Jodhpur-Luni Section of NWR in Jodhpur Distt., Rajasthan. | RITES Ltd., Gurgaon | Salawas |
13 | Conducting specialized activities and detailed topographic field survey for development of ICD at Manawala, Amritsar (Punjab). | RITES Ltd. | Manawala, Amritsar |
Bridge Design Projects
S.No | Description of Work | Client | Location of Work |
---|---|---|---|
1 | Detailed design of foundation and sub structure of Major Bridge No. (108, 118, 120 & 122) in connection with Varanasi- Allahabad doubling Project NE Railway Varanasi Division in the state of Uttar Pradesh, India. | RVNL | Varanasi- Allahabad |
2 | Design & Preparation of GAD, Structural drawings & collection of required field data for construction of ROB and RUB from Chainage 78 kms. to 157 kms in Yavatmal – Digras in connection with Yavatmal – Nanded New BG Line Project. | RVNL | Yavatmal-Digras |
On Going Projects
S.No | Description of Work | Client | Location of Work |
---|---|---|---|
1 | Final Location survey (FLS) for doubling of Firozpur-Bhatinda and Jakhal-Hisar (168.80 kms). Carrying out detail Engineering survey including Leveling, alignment, soil exploration, preparation of plans, L-sections, GA plans of Bridges etc., bill of quantities and other ancillary activities related in connection with preparation of DPR. | Northern Railway | Firozpur-Bhatinda and Jakhal-Hisar |
2 | Final Location survey (FLS) for new line between Rae Bareli-Akbarganj- Ayodhya (118kms.). Carrying out detail Engineering survey including Leveling, alignment, soil exploration, preparation of plans, L-sections, GA plans of Bridges etc., bill of quantities and other ancillary activities related in connection with preparation of DPR. | Northern Railway | Rae Bareli-Akbarganj- Ayodhya |
3 | Rae Bareli-Akbarganj- Ayodhya | YUKSEL PROJE | Jammu& Kashmir and Himachal Pradesh |
4 | Carrying out Stage-1 preliminary route selection for new High Speed Rail Corridors (Varanasi-Patna-Howrah) (760 Km) for NHSRCL. | National High Speed Rail Corporation Limited | Varanasi-Howrah |
5 | Preparation & Submission of Plan & Profile for Two Option (i.e. 200 KMPH & 300 KMPH) for Delhi to Varanasi Section on the Basis of Available data. | National High Speed Rail Corporation Limited | Delhi-Varanasi |
6 | Detailed project report for rail connectivity between new REWARI JS (from km 5.2) of DFCCIL and Kishangarh Balwas (rewari-hisar line of IR) to existing Gurgaon line of IR at Kumbhawas station. | Matrix Geo | Rewari, Haryana |
7 | Conducting Topographic Survey of Railway Land between Lalitpur-Bina section & Preparation of ESPs of stations & Project sheet in connection with the work of Bina-Jhansi 3rd Line Project. | North Central Railway (Const.) | Lalitpur-Bina |
8 | Final Location Survey by aerial method including Preparation of detailed plans and sections and marking centre line, in connection with doubling of Mau-Shahganj (99.75 kms.) route of Varanasi Division of North Eastern Railway in the State of Uttar Pradesh, India. | RVNL | Mau to Shahganj |
9 | Conducting Final Location Survey and preparation and submission of land proposal for acquisition of land from Mau to Ghazipur City in connection with construction of new BG line from Mau to Tarighat including construction of Rail cum road bridge across river Ganga at Ghazipur, Uttar Pradesh. India. | RVNL | Mau to Ghazipur |
10 | Land Acquisition and the Forest Clearance Works for Final Location Survey (FLS) work of 475 km long Bilaspur-Manali-Leh New BG Rail Line in the states of Jammu and Kashmir and Himachal Pradesh, India. | YUKSEL PROJE | Jammu& Kashmir and Himachal Pradesh |
11 | Design of alignment for New BG Line from Rangpo- Gangtok (69km) in ruling gradient of 1 of 60. (New Jalpaiguri) | NFR | Sikkim |
12 | Preparation of ‘Feasibility Report (FSR)’ & ‘Detailed Project Report (DPR)’ & obtaining approval from Railway from Railway for construction of new line/ modification of existing rail lines at Kathara (W)siding by keeping provisioning for Rapid Loading System for New Kathara Washery’ | IPRCL | Kathara |
13 | Processing of Satellite Imagery and Remote Sensing Studies- Imphal Moreh New Railway Line & Tanakpur-Bageshwar new Railway Line | Excel Geomatics Pvt Ltd. | Manipur & Uttarakhand |
14 | Final Location Survey (FLS) using Digital Terrain/Elevation Model (DTM/DEM/DSM)generated from satellite OR LiDAR imageries, staking of alignment on ground Geophysical mapping etc. in connection with Imphal-Moreh new BG single line project in Manipur.(Total approx.length 110 Km). | IRCON | Imphal- Moreh, Manipur |
15 | Revised offer for Detailed Design Consultancy Services for Structural Components of ‘4th Line with Flyover at Subedarganj, Prayagraj (RFO-2) on Allahabad- Bamhrauli Section’ | B&S Engineering Consultants Pvt. Ltd. | Prayagraj |
16 | Processing of Satellite Imagery- Imphal Moreh New Railway Line | Satpalda Trading Private Limited | Manipur |
17 | Carrying out Traverse Survey & Checking of Alignment works from T12P2, T13P1 and T14P1 to T14 Part including as built tunnels and surrounding area. | KRCL | Reasi |
18 | Checking of Alignment of Tunnel T-3 to T-12 | KRCL | Reasi |
19 | Consultancy Services for Preparation of Detailed Project Report and Providing Pre-Construction activities for Construction of Highway Tunnel across Shinkun La Pass connecting NH-03 and Zanskar Valley on Darcha-Padam Road (NH-301) including approaches in Himachal Pradesh & Ladakh. Package I | M/S Geo consult India Pvt. Ltd.- RITES Ltd. (JV) | Shinkun La Himachal Pradesh& Ladakh. |
20 | Final Location Survey (FLS) Work 154.580km Long Tanakpur - Bageshwar –New BG Rail Line in State Uttarakhand. | IRCON International Ltd. New Delhi | Uttarakhand. |